Adam O'NeillLast updated 8 min readPart of Earned value (EVM) and cost contingency

What is Project controls day rate?

A project controls day rate is the daily charge for a planner, cost engineer, risk specialist or controls lead. SOMA's Q3 2026 benchmark runs from £280 for a junior planner to £1,300 for a Head of Project Controls, with senior QRA specialists at up to £1,100. Rates are outside IR35 and before VAT.

Day rates in £, before VAT, for a full working day. Every band is a SOMA benchmark, Q3 2026, from engagements and advertised roles we track. Not market data. Last reviewed 24 October 2026.

RoleExperience (SOMA working definition)Day rate, outside IR35Basis
Planning: Junior Planner / Scheduler0-3 years, P6 or MS Project, supervised, single contract£280-£380SOMA benchmark, Q3 2026
Planning: Planner / Scheduler3-7 years, P6 proficient, NEC4, maintains an Accepted Programme independently£380-£520SOMA benchmark, Q3 2026
Planning: Senior Planner7-12 years, multi-contractor programmes, DCMA 14-point schedule assessment, schedule risk£520-£700SOMA benchmark, Q3 2026
Planning: Lead Planner / Planning Manager12+ years, programme-wide planning function, client or Tier 1, Gateway Review£700-£900SOMA benchmark, Q3 2026
Cost: Cost Engineer3-7 years, cost control, earned value, WBS, monthly cost reporting£380-£520SOMA benchmark, Q3 2026
Cost: Senior Cost Engineer7-12 years, estimate development, contingency, earned value implementation£520-£680SOMA benchmark, Q3 2026
Cost: Cost Manager / Commercial Controls Lead12+ years, programme cost governance, EAC ownership, board-level reporting£680-£900SOMA benchmark, Q3 2026
Cost: EVMS SpecialistANSI/EIA-748 EVMS implementation, able to train a team to run it£650-£950SOMA benchmark, Q3 2026
Risk: Risk ManagerRegister, workshops, qualitative risk, monthly reporting£420-£600SOMA benchmark, Q3 2026
Risk: QRA AnalystMonte Carlo QSRA or QCRA in tools such as @RISK or Safran Risk, not integrated£550-£750SOMA benchmark, Q3 2026
Risk: Senior QRA Specialist / integrated QCSRAIntegrated cost-schedule risk, published-practice method, Gateway Review experience, report that withstands challenge£750-£1,100SOMA benchmark, Q3 2026
Controls: Project Controls CoordinatorReporting, data management, dashboards£280-£400SOMA benchmark, Q3 2026
Controls: Project Controls ManagerLeads a controls team, integrated schedule-cost-risk reporting, client or Tier 1£650-£900SOMA benchmark, Q3 2026
Controls: Head of Project ControlsPortfolio-level function, several concurrent programmes, board reporting£900-£1,300SOMA benchmark, Q3 2026

Where these figures come from

Every band in this guide is a SOMA benchmark, Q3 2026, from engagements and advertised roles we track. It is not market data, a published survey or agency placement data, and we do not publish a sample size. Use it to sense-check a budget, not to set a contract price.

Rates are outside-IR35 contractor day rates, before VAT. The experience bands are SOMA's working definitions of each grade, not an industry standard. The range runs from around £280 for a junior planner to £1,300 for a Head of Project Controls. The highest specialist band is the Senior QRA Specialist, at up to £1,100. No figure in this guide is higher than the table. We review the benchmark each quarter.

Reading the table

Each range is cross-sector. In our experience the upper end goes to people with nuclear, rail or defence experience, where sector rules shape the work, for example possession planning or nuclear baseline control. We have not quantified that premium, and no band is stretched past its stated top figure for sector.

Cost estimators have no separate band. An estimator who can produce Class 1 to Class 3 estimates (semi-detailed to detailed unit-rate build-up) sits towards the top of the Cost Engineer range. Class 4 and Class 5 estimates are factored or parametric, and Class 5 is the least defined, used for concept screening with typical ranges of -20% to -50% on the low side and +30% to +100% on the high side. See AACE International RP 17R-97 Cost Estimate Classification System.

The EVMS Specialist band is for people who have implemented a system against ANSI/EIA-748 (current revision). We do not give bands for forensic delay analysts, PMO analysts or commercial managers and quantity surveyors, because the roles vary too much to benchmark here.

Why senior QRA specialists sit at the top of the specialist bands

A Senior QRA Specialist is benchmarked at £750 to £1,100, above the QRA Analyst (£550 to £750), the EVMS Specialist (£650 to £950) and the Risk Manager (£420 to £600). Four things drive the difference.

Scarcity: in our experience few practitioners can run an integrated cost and schedule risk analysis and defend it. Timing: a QRA usually feeds a funding or Gateway decision on a fixed date, so a weak model is costly to redo and there is rarely time to run it twice. Scrutiny: the confidence levels you report are tested at NISTA (formerly the IPA) assurance, Gateway Reviews and client challenge, and the analyst has to explain every input. Method: the work follows published practice, such as AACE International RP 57R-09 Integrated Cost and Schedule Risk Analysis Using Risk Drivers and Monte Carlo Simulation of a CPM Model and RP 65R-11 Integrated Cost and Schedule Risk Analysis and Contingency Determination Using Expected Value, on a schedule that has first been checked against the DCMA 14-point assessment.

The premium pays for a model that holds up under challenge, not for software run time.

Inside IR35: a worked illustration

The table has no inside-IR35 column. An inside-IR35 figure is not a separate market rate: it follows from how the engagement is paid. The example below shows the arithmetic for one rate. It is an illustration with stated assumptions, not tax advice.

The rules first. Public sector clients have determined off-payroll status since April 2017, and medium and large private sector clients since April 2021. There is no default inside: status is decided for each engagement. Where a worker is inside, tax and National Insurance are deducted before the worker is paid. Take employment-tax advice on any specific engagement.

Assumptions: a £600 day rate, which sits in the Senior Planner band; an umbrella margin of £25 a day; employer National Insurance at 15% (the rate from April 2025); apprenticeship levy at 0.5% of pay; no holiday pay accrual; the employer NI secondary threshold ignored, which slightly understates gross pay. Employer costs come out of the £600. They are not added to it.

Arithmetic: £600 less the £25 margin leaves £575. Gross pay is £575 divided by 1.155, which is £497.84 a day. Employer NI is £74.68 and the levy £2.49, and pay plus both add back to £575 within a penny. Gross pay is therefore about 83% of the day rate (£497.84 divided by £600), and income tax and employee NI then come off that. Take-home depends on the individual, so we do not quote one.

For budgeting, this is why an inside engagement at an unchanged rate often gets renegotiated: the worker receives about 17% less gross pay than the day rate suggests. The size of any uplift is for the parties to agree on each contract.

From day rate to annual cost

Day rates exclude holiday, sickness, pension, professional indemnity cover and unbilled time. A contractor billing 200 days a year at £600 invoices £120,000, against £156,000 for 260 weekdays at the same rate, a gap of £36,000. The 200 days is our working assumption. Budget on days actually worked and expect the gap to be priced in.

Contractor, consultancy or fixed-price study

Choose a contractor when you need a named individual working under your direction, on your methods, for months. Choose a consultancy when you need a defined output to a date, with review and cover behind it. Choose a fixed-price study when the output is a QSRA, QCRA or independent validation with a clear scope and a gate date.

A consultancy day rate for senior planning or QRA work sits above the contractor bands in this table. It buys what a contractor day rate does not: the firm's method and templates, review of the model before issue, cover if the lead is unavailable, and a contract under which the firm is responsible for the deliverable. Compare total cost per deliverable, not day rate to day rate.

On IR35, a bona fide fully contracted-out service is outside the off-payroll rules for the client. The supplier's own people still carry status, whether they are employees or work through their own companies, so ask any supplier how its individuals are engaged.

On a QSRA we agree the scope, programme basis and reporting confidence levels in writing before modelling starts, check the schedule against the DCMA 14-point assessment, and review the model before it is issued. Where the scope is clear we quote a fixed price for the study.

Benchmarking day rates, or sizing a capability gap?

If you are pricing day rates you are sizing a capability gap. SOMA fills it as a contracted service: QRA, planning, cost and risk delivered to a defined output, with the firm responsible for the deliverable rather than an individual on a day rate.