Why we exist

Every major UK programme ends up in the same three conversations: is the schedule realistic, can we afford it, and what are we actually worried about? Most controls functions are set up to report those answers. A much smaller number are set up to get them right.

We are built for the second job. Small, senior, honest about the numbers. We have sat in the chair — planning, cost engineering, risk leadership — on live programmes in rail, highways, nuclear, water, defence and energy. That experience is the product.

What we believe

  • Controls is a craft, not a commodity. Tools matter, but the judgment behind them matters more.
  • Plain English is professional. If we can't explain the decision to a non-specialist, we don't understand it yet.
  • The truth belongs at the top of the page. Bad news does not age well. We surface it early and offer a route through.
  • Clients should leave stronger than they arrived.Our engagements finish. The capability we leave behind does not.

How we work

We work as an extension of your delivery team. Small cell, senior bias, named leads on every engagement. We will tell you what we see — even when that is inconvenient — and we will do so without the drama that makes bad news worse.

Who we work with

UK Tier 1 contractors, asset owners and major programme organisations. Rail, highways, nuclear, water, defence and energy. Programmes from tens of millions to multiple billions in outturn value. From pre-FEED through handover — and back again when the numbers need a second look.

See our credentials →
Meet the team →

LinkedIn

Meet us on LinkedIn

We post practitioner commentary on UK project controls — QRA, schedule assurance, earned value, contract interfaces. Short, useful, no listicles. Follow along if you work in the space.

Follow SOMA on LinkedIn

In the news

Partnerships and third-party mentions.

Frequently asked

About SOMA Project Controls

What is SOMA Project Controls?
SOMA Project Controls is a UK project controls consultancy founded in 2024 and based in Middlesbrough. We specialise in quantitative risk analysis (QRA), project planning and scheduling, cost management, risk operations, integrated PMO, and project controls advisory. Registered as SOMA PROJECT CONTROLS LTD (Companies House 16001237), we are chartered through APM, ACostE, AACE, RICS and IRM. Our lead capability is QRA delivered to AACE International recommended practices.
What sectors does SOMA work in?
SOMA works across UK infrastructure and major programmes in rail, highways, nuclear, water and utilities, defence, energy, industrial construction, and public sector. Recent engagements include Sellafield Ltd, Bilfinger UK, National Highways, AtkinsRéalis, Mitsubishi Chemical Group UK, and RRL Group.
How is SOMA different from other project controls consultancies?
SOMA is a pure-play project controls firm — not a side-line of a larger audit, tax or management-consultancy practice. Every engagement is led by a named, chartered practitioner with live-programme experience. We specialise in QRA and schedule risk to AACE standards, and we write reports in plain English so decision-makers can act on them. We do not run controls as a staff-augmentation commodity.
What tools does SOMA use for QRA?
Our Monte Carlo models run in Safran Risk, Oracle Primavera Risk Analysis, @Risk for Excel, and Deltek Acumen Risk, depending on the project and client preference. We integrate cost-schedule risk analysis (QCSRA) where the schedule is well-structured enough to support it. We output P50, P80 and P95 confidence curves, tornado charts, and sensitivity analysis, plus a written report aligned to AACE International recommended practices (57R-09, 113R-20, 118R-21, 123R-22).
Where is SOMA Project Controls based?
SOMA is registered at 13T, Queensway House, Queensway, Middlesbrough, TS3 8TF, United Kingdom. We deliver on client sites and remotely across the UK.
How does SOMA engage with clients?
Every engagement begins with a 30-minute discovery call. If the shape of the problem matches the shape of our work, we return within one working day with a short scoping note covering scope, duration, team, and indicative cost. No obligation, no drip sequence. We work as an extension of the client delivery team — small, senior, named leads.

Got a programme that needs the numbers straight?

Tell us what you are working on. We will come back within one working day with a useful answer — not a sales pitch.