Adam O’Neill — SOMA Project Controls

Adam O’Neill

Director | QRA Specialist | Cost Lead

Leadership & Mgmt Degree · APM PMQ · IOSH

Senior risk and project controls practitioner with 20 years across nuclear, infrastructure, water, defence and industrial capital programmes — from £100k schemes to multi-billion portfolios. Quantitative risk specialist since 2020, with programme QRA leadership on the National Highways £1bn+ portfolio, independent validation on Mitsubishi Chemical UK (£400m), and a risk transformation on Northumbrian Water that lifted risk identification by 96% across 400+ projects. Founded SOMA to do the work properly, without the consultancy theatre.

Max Stovell — SOMA Project Controls

Max Stovell

Head of Risk Management | QRA Specialist

BSc Construction Management & Surveying · APMP · Risk Management Practitioner

Senior risk manager with 15+ years across aviation, highways, rail, water, ports, pharmaceuticals and residential sectors — from £5m schemes to £14bn mega-programmes. Led the National Highways RIS3 integrated risk team to recognition as Public Sector Risk Programme of the Year at the CIR Risk Awards 2022. Programme risk lead on Stansted Airport Transformation and Network Rail’s Crossrail 2 route definition, and an active mentor of risk professionals entering the industry.

Paul Russell — SOMA Project Controls

Paul Russell

Senior Risk Consultant | QRA Specialist

Accounting & Finance Degree · APM Risk

Thirteen years’ risk experience across oil & gas, defence, nuclear, aviation, rail, water and highways. Senior risk controller on BAE Systems Type 26 GCS QSRA. A subject-matter expert in Monte Carlo and scenario analysis.

Douglas Baldy-Gray — SOMA Project Controls

Douglas Baldy-Gray

Senior Risk Consultant | QRA Specialist

BSc (Hons) · IRM Cert · MoR · APMP

Twelve years in risk management across nuclear, highways, rail and industrial programmes. TOC Risk Manager on Sizewell C (£38bn), providing LOD 1 assurance of cost, schedule and risk across the CWP Alliance. QRA commission lead on 38 National Highways major projects monthly, and lead designer of the Bilfinger UK portfolio risk framework. Calm under pressure and practiced at lifting risk maturity inside client organisations.

Anna-Marie O’Neill — SOMA Project Controls

Anna-Marie O’Neill

Business Operations Lead

MSc Psychology · BA Philosophy

Anna-Marie runs SOMA’s business operations — client relationships, commercial admin and the day-to-day systems that keep a small consultancy running cleanly. Her background is psychology, teaching and small-business operations: she co-founded Stone & Sage Collective and previously ran the Ananda Wellbeing studio. Keeps the business side of SOMA organised and on time.

Joining us?

We are hiring at senior practitioner level.

If you are a chartered planner, cost engineer or risk lead with live programme scars and a bias for plain English, we would like to hear from you.

Drop us a line →

LinkedIn

Follow the team on LinkedIn.

The SOMA directors and consultants post regularly on project controls practice — QRA workshops, schedule assurance, NEC4, earned value, and the specific edge cases we run into on live programmes. If that sounds useful, we would value the follow.

Follow SOMA on LinkedIn

Got a programme that needs the numbers straight?

Tell us what you are working on. We will come back within one working day with a useful answer — not a sales pitch.