Primavera P6 (commonly just P6) is Oracle's enterprise-grade project scheduling and portfolio management tool. It is the de facto standard on UK major infrastructure programmes — Network Rail and HS2 supply chain contracts typically mandate it, as do National Highways programmes, large defence contracts and most multi-party NEC4 programmes above a certain size. It handles multi-project, multi-user working with resource levelling, EVMS reporting, schedule risk analysis integration and integration with Primavera Risk Analysis / Safran Risk for Monte Carlo analysis.

P6's dominance on UK major programmes reflects both its capability and its ecosystem: planners with P6 experience are widely available, third-party tools (Acumen Fuse, Schedule Analyzer, Deltek Acumen Risk) integrate with P6 databases, and contractual reporting templates in rail, highways and defence are designed around P6 data structures. The main alternative — Microsoft Project — does not scale to the multi-project, enterprise-database environment that P6 is built for, and is typically confined to smaller single-contract projects.

For organisations that must work in P6 because of a contractual requirement or client standard, the main risks are shallow expertise (treating P6 as a drawing tool rather than a network planning tool), database hygiene (multiple uncontrolled copies of the same project drifting apart), and user-role management (too many people with edit rights, no discipline around baselining). SOMA's planners work in Primavera P6 where the client standard requires it.

Used in practice

Need this on a live programme?

SOMA delivers this on live UK programmes — and trains teams in it. Where it fits:

Putting these techniques into practice?

SOMA provides independent project controls consultancy for UK programmes. We can help you apply QRA, EVM, schedule risk analysis, and more.