Glossary
As-Planned Schedule
The schedule showing what the project intended to do at a specific reference point — typically the baseline at contract signature, used as the starting point for delay analysis.
The as-planned schedule is the version of the programme that represents the intended execution at a specific reference point — most commonly the baseline Accepted Programme at contract signature. It is the starting point against which actual execution is compared in delay analysis, either directly (as-planned versus as-built) or through more sophisticated methods like window analysis and time impact analysis.
The as-planned schedule needs to be a proper network, not just a Gantt chart. Logic must be complete, activities must be traceable to scope items, and the critical path must be defensible. Delay analysis that uses an as-planned schedule with weak logic or undefended constraints will produce conclusions that do not survive challenge — because the as-planned does not actually represent what the project intended to do in a meaningful network sense.
The SCL Delay and Disruption Protocol distinguishes between as-planned (the starting reference) and as-built (what actually happened) and describes how both are used in different delay analysis methods. The two are fixed reference points; the analytical methods operate on the space between them. Disciplined programme management during delivery — maintaining clean baselines, proper version control, and defensible logic — is what makes as-planned and as-built schedules useful for analysis later.
Used in practice
Need this on a live programme?
SOMA delivers this on live UK programmes — and trains teams in it. Where it fits:
Putting these techniques into practice?
SOMA provides independent project controls consultancy for UK programmes. We can help you apply QRA, EVM, schedule risk analysis, and more.